Previous Workparty Notices

Current Workday Notice - 22nd July 2017

A workday will be held this Saturday 22nd July 2017 at 10:30 Oldbridge Guard Lock - Lock 2 (side of Battle of the Boyne Centre)*.

Fitting of on the lockgates at Oldbridge Guardlock - Lock 2 is set to continue. If we have the crew, work might start on removing the concrete barrier underneath the bridge.

We brought Howth Sailing and Boating Club on a up the Boyne, up through the Oldbridge Sealock - Lock 1, up as far as the Oldbridge Guardlock - Lock 2. We then walked up to the Battle of the Boyne Vistors Centre took a tour. If we had more time the fabulous gardens would have been explored but we had to get back onto the water to ensure we made the tide be water levels weren't too shallow. The group were brought back down to the Oldbridge Sealock - Lock 1 and back out onto the Boyne. They were left back down to the new platform, Fiddle Case Pier in Drogheda Port. It was hoped to cover the days going on via our Facebook and Twitter page but sadly mobile coverage failed these efforts.

We provide free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Workday Notice - 8th July 2017

A workday took place on Saturday 8th July 2017 at 10:30 on the combined Oldbridge sections, Oldbridge Sealock - Lock 1 and above Oldbridge Guard Lock - Lock 2 (side of Battle of the Boyne Centre)*.

Our work continues tomorrow at the Oldbridge Guardlock - Lock 2. Additional fitting on the lockgates will take place. If we have the crew grass cutting will take done on the grass verge between the Obelisk Bridge and the Oldbridge Guardlock - Lock 2.

We will be hosting Howth Sailing and Boating Club on a visit tomorrow up to the Battle of the Boyne Vistors Centre. We will be bring them up the River and then through the Oldbridge Sealock - Lock 1 and up as far as the Oldbridge Guardlock - Lock 2. Keep an eye on our Facebook and Twitter page for intended updates of our days activities.

Sealing of the Oldbridge Guardlock gates was carried out. Some strimming took place around the Guardlock area also.

We welcomed along a new member to our group who we had met at the Irish Maritime Festival at Drogheda Port. He proved himself a valuable asset the last day.

We provide free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Current Workday Notice - 24th June 2017

A workday will be held this Saturday 24th June 2017 at 10:30 on the combined Oldbridge sections, Oldbridge Sealock - Lock 1 and above Oldbridge Guard Lock - Lock 2 (side of Battle of the Boyne Centre)*.

We are going to be united as a group this Saturday to continue our work up at the newly installed lockgates up the side of Oldbridge House. Additional fitting is going to take place on the gates.

Reinforcing of the stonework took place out at the Oldbridge Guardlock. Some additional work for installing a fence at our rent storage area was also done.

Our group at the Irish Maritime Festival - Drogheda Port had a very successful weekend. They are alot of questions about the newly installed lockgates and many donation on the back of this work to aid our restoration work. We met former volunteers to the restoration and one or two were interested to find out about getting involved once again. There was one of two young fellows who also expressed interested in coming abroad our restoration effort.

An excellent addition to our exhibition stand this year was the wood craft wood, which two of our group made. It ranged from quirky faces, coasters, insect hotels to plaques with burnt in messages on them to mention a few of the items.

We provide free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Workday Notice - 10th June 2017

A workday was held Saturday 10th June 2017 at 10:30 on the combined Oldbridge sections, Oldbridge Sealock - Lock 1 and above Oldbridge Guard Lock - Lock 2 (side of Battle of the Boyne Centre)*.

Our group are going to be split in three this time. One group will be working up at the Oldbridge Guardlock - Lock 2, another out at our equipment storage area and the final group at the Maritime Festival - Drogheda Port.

Additional fitting out work will take place on the newly installed lockgates at Lock 2.

Our equipment storage area recently got moved around, so this will now be reorganised.

For the four year we are going to have our exhibition trail at the Irish Maritime Festival, Drogheda. Alot of work has been put in behind the scenes so expected some interesting additions to our stand this year. Our star attraction dinghy will be back once again this year, it was quiet the crowd pleaser.

We provide free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Workday Notice - 20th May 2017

A workday was held Saturday 20th May 2017 at 10:30 on the combined Oldbridge sections, Oldbridge Sealock - Lock 1 and above Oldbridge Guard Lock - Lock 2 (side of Battle of the Boyne Centre)*.

A litter pick is going to take place on the Oldbridge section. A tree was noted to be down across the towpath and waterway above the Oldbridge Guardlock - Lock 2

We welcomed along visitors from many of the Ulster sections of the I.W.A.I, along with one person from the Barrow, the last day. They were taken on a guided tour of Oldbridge Sealock - Lock 1, Oldbridge Guardlock - Lock 2, Slane Guardlock - Lock 8. We had lunch in the Conyingham Arms Hotel, Slane. During the other half of the day we brought them to Boyne Currach exhibition and finished at Staleen Lower - Lock 3. The weather gods thankfully were in our favour on the day.

We provide free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Current Workday Notice - 6th May 2017

A workday will be held this Saturday 6th May 2017 at 10:30 on the combined Oldbridge sections, Oldbridge Sealock - Lock 1 and above Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*.

The grass between the Obelisk and Oldbridge Guardlock - Lock 2 is due a trim so this will be on our work list. The Oldbridge Sealock - Lock 1 will also get a cut. The last known part of a fallen tree in the channel above the Oldbridge Guardlock - Lock 2 is hoped to be removed depending on how many people will be there on the day.

We will be welcoming visitors from many of the Ulster sections of the I.W.A.I tomorrow. The plan is to be give them an insightful tour of sections of the Boyne Navigation, as far as halfways up.

We are providing free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Workday Notice - 22th April 2017

A workday was held Saturday 22th April 2017 at 10:30 on the combined Oldbridge sections, Oldbridge Sealock - Lock 1 and above Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*.

The grass at the Oldbridge Sealock - Lock 1 is due a cut. A known fallen tree above the Oldbridge Guardlock - Lock 2 is planned to be removed also.

Another one of our crew was welcomed back after an extended break. All hands on deck were needed the last day so he was very much welcome back.

We are providing free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Workday Notice - 8th April 2017

A workday was be held on Saturday 8th April 2017 at 10:30 above Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*.

It hasn't been decided what the plan for Saturday is but work to take place on the Oldbridge section none the less.

A number of trees had fallen across the waterway above the Oldbridge Guardlock - Lock 2. These were cleared from the water.

It was great to welcome back on board one of our injured for the year ahead. The work we were doing was very much needing This was very much appreciated.

We are providing free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Workday Notice - 25th March 2017

A workday was held on Saturday 25th March 2017 at 10:30 above Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*.

We have been informed that a number a trees have fallen across the waterway above the Oldbridge Guardlock - Lock 2. These will hopefully be all removed Saturday.

Our group carried out a last minute workday up at Athlumney, Navan. A number of trees had fallen across the waterway up there so these were cleared. One of our crew who has been recently been injuried and is Navan based, managed to drop down to help out. This was very much appreciated.

We are providing free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation - I.W.A.I.

Workday Notice - 11th March 2017

A workday was held on Saturday 11th March 2017 at 10:30 between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

We are making the best of the "cutting season" so we will be back cutting the growth to the boundry of the waterway in the Oldbridge section.

We moved beyond the bridge which spans the navigation next to the Oldbridge house entrance. Additional cutting was done in the direction of the Oldbridge Guardlock -Lock 2. We had a volunteer from Louth Volunteer. He did a sterling job carrying out a litter pick between Oldbridge Guardlock - Lock 2 and above mentioned bridge, I'd say it been a good while since such an intensive letter pick was done along this section. He managed to end up with four black sacks full. We are hoping Meath County Council might be able to help relieve us of our recent boundy for free.

The area we have our cars parked sadly has been known to attract vehicle break-ins so we have to dedicate on of our "staff" to security duties!!

We are providing free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 25th February 2017

A workday was held on Saturday 25th February 2017 at 10:30 between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

We will be making the best of our opportunity to cut growth back to the boundry of the waterway at the Oldbridge section, on the day.

We did a bit of tidying up by Oldbridge Guardlock - Lock 2 the last day, our footprint is back to a minimum there once again.

A helpful in dividual/ s had throughen in one of our construction fences next to the lock, this shouldn't be too much hassle to retrieve but our valuable time and efforts will be diverted from other work to do this.

The area we have our cars parked sadly has been known to attract vehicle break-ins so we have to dedicate on of our "staff" to security duties!!

We are providing free magazines, producted by our parent group to all takers, drop by if such might take your fancy.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 28th January 2017

A workday was held on Saturday 28th January 2017 at 10:30 between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

More cutting of growth during this upcoming workday.

Some of our guys were under the weather from the various alement going around so we didn't have as big a crew. Additional cutting took place along the Oldbridge section of the waterway. A section down to the bridge (spanning the navigation) next to Oldbridge House was complete. Further stone pointing was done up at the Oldbridge Guardlock - Lock 2, where the lockgates will be fitted.

Some of our guys headed up to help out the I.W.A.I. Newry and Portadown, since our last workday. They were made feel more than welcome up there. It was good for our guys to see in the person, the great work been done up there. Their article's in our parent group's magazine are very descriptive, but nothing like seeing it all in the part :-)

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 21st January 2017

A workday was held Saturday 21th January 2017 at 10:30 between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

Cutting of growth will take place the upcoming workday.

Some of our guys were under the weather from the various alement going around so we didn't have as big a crew. Additional cutting took place along the Oldbridge section of the waterway. A section down to the bridge (spanning the navigation) next to Oldbridge House was complete. Further stone pointing was done up at the Oldbridge Guardlock - Lock 2, where the lockgates will be fitted.

Some of our guys headed up to help out the I.W.A.I. Newry and Portadown, since our last workday. They were made feel more than welcome up there. It was good for our guys to see in the person, the great work been done up there. Their article's in our parent group's magazine are very descriptive, but nothing like seeing it all in the part :-)

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Cancelled: Workday Notice - 14th January 2017


Workday Notice - 10th December 2016

A workday was held Saturday 10th December 2016 at 10:30 between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

More cutting back of growth is planned for this upcoming workday.

More cutting tomorrow. It will be our final session out this year and its looking like its going to be a little colder vs what it has been over the week.

We had a bigger showing the last day of our crew but lets hope we get as near full crew tomorrow. A new guy is expected along.

Since we are wrapping up we will be have our customary mince pies during lunch to guild the lilly.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Current Workday Notice - 5th November 2016

A workday will be held this Saturday 5th November 2016 at 10:30 between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

More cutting back of growth is planned for this upcoming workday.

It was all about the cutting the last day, we had two crews, one working on the banks and another working on the walk way (towpath) up to Lock 2. The summers growth was been trimmed back along with providing clearance for machinery which will need to travel up the towpath to enable the lockgate installation.

We had an additional new person to our crew the last day, another skilled hand to our crew but we are always looking for people to help out.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Current Workday Notice - 22th October 2016

A workday was held Saturday 22th October 2016 at 10:30 at our yard and Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*

Installation of lockgate brackets at the Oldbridge Guardlock - Lock 2. Some cutting of brushes on the Oldbridge section will also be done.

Additional alternations were done to the lockgates. It was hoped to install the Oldbridge Guardlock lockgate brackets on the 10th September but a car had blocked full access to the walkway up to the lock. We had to cancel our planned workday on the 24th September during to strong winds and the forecast rain.

We had an additional new person to our crew the last day, another skilled hand to our crew but we are always looking for people to help out.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Current Workday Notice - 8th October 2016

A workday was held Saturday 8th October 2016 at 10:30 at our yard and Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*

Installation of lockgate brackets at the Oldbridge Guardlock - Lock 2. Some cutting of brushes on the Oldbridge section will also be done.

Additional alternations were done to the lockgates. It was hoped to install the Oldbridge Guardlock lockgate brackets on the 10th September but a car had blocked full access to the walkway up to the lock. We had to cancel our planned workday on the 24th September during to strong winds and the forecast rain.

We had an additional new person to our crew the last day, another skilled hand to our crew but we are always looking for people to help out.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Cancelled: Workday Notice - 24th September 2016

Workday Notice - 10th September 2016

A workday was held on Saturday 10th September 2016 at 10:30 at our yard

Work will be concentrated up in our yard. Additional fitting will be done to the lockgates. Some other work needs to be done up in the yard.

Great to welcome along a new person to our crew. He has been playing a blinder up to now!!

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 27th August 2016

A workday was held on Saturday 27th August 2016 at 10:30 Oldbridge Sealock - Lock 1*.

We will be solely be based at the Sealock preparing for our Heritage week free boat trips on Sunday 28th August only.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 13th August 2016

A workday was held on Saturday 13th August 2016 at 10:30 at our yard, an section between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

Additional work will be done Guardlock lockgates, new bases will be set oout for our containers and a clean up will be done along the Oldbridge section of the canal.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 30th July 2016

A workday was held on Saturday 30th July 2016 at 10:30 at our yard, an section between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

We will be focusing work up at the Oldbridge Guardlock (Lock 2).

The Oldbridge Guardlock Lockgates were given a 2nd coat of paint in our yard. Our equipment was also.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 16th July 2016

A workday was held Saturday 16th July 2016 at 10:30 at our yard, an section between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

The Oldbridge Guardlock Lockgates will be given a 2nd coat of paint in our yard. A litter pick will be carried out on the Oldbridge section of the Boyne Navigation.

Some trees had fallen across and into the canal, these were cleared to allow Boyne Boats trips clear passage along this section.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 9th July 2016

A workday was held on Saturday 9nd July 2016 at 10:30 Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)* and Oldbridge Sealock - Lock 1*.

A litter pick will be carried out on the Oldbridge section of the Boyne Navigation. Some trees have fallen across and into the canal, these will be cleared to allow Boyne Boats trips clear passage along this section.

The last day work was contentrated on the Oldbridge Sealock - Lock 1. The private lawns were cut, a general sweep and tidy up was carried out.

Seems like we might be set for a wet day Satuday, keep an eye on our facebook page for further updates.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice - 2nd July 2016

A workday will be held this Saturday 2nd July 2016 at 10:30 at our yard and Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*.

The Guard Lock lockgates turned over the last day and given their first coat of paint. Our group will be split into two: 1 group giving these gates a 2nd coat of paint (pending weather) and the other down at the Guardlock preparing for the their installation.

Seems like we might be set for a wet day Satuday, keep an eye on our facebook page for further updates.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice: 18th June 2016

A workday will be held this Saturday 18th June 2016 at 10:30 between Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre)*. and Oldbridge Sealock - Lock 1*.

The Guard Lock lockgates will be getting another coat of paint. Up around the area of Lock 2, we will be strimming the verges. Other parts of the Oldbridge section will be assessed for further work to be carried out.

Forecast for the day seems to be changeable (as of Wednesday) for what it will be like on Satuday, keep an eye on our facebook page for further updates.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice: 4th June 2016

A workday will be held this Saturday 4th June 2016 at 10:30 between Lower Newgrange (Staleen, Donore, Co. Meath)*. and Oldbridge Sealock - Lock 1*.

The plan for work on the day is to strim along the Oldbridge section. We continue work on the stonewall canal bank, building up it up to its original level. If we have enough people on the day, the lockgates for Lock 2 will be given an extra coat of paint in preparation for future installation.

Forecast for the day isn't to be great but we will turn up and see how it goes on the day.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice: 21st May 2016

A workday will be held this Saturday 21th May 2016 between 10:00 - 10:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*. Our work is due to continue on the our "Great Wall of China" - Boyneside!! We will be continuing to build up the stonewall canal bank, heading back up towards the the horsebridge. Forecast for the day isn't to be great but we will turn up and see how it goes on the day.

We continued work on the stonewall canal bank during our last workday. Steady progress was made during the day. Some from our group will be doing some trimming of grass also.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 14th May 2016

A workday will be held this Saturday 7th May 2016 between 10:00 - 10:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*. Our work is due to continue on the our "Great Wall of China" - Boyneside!! We will be continuing to build up the stonewall canal bank, heading back up towards the the horsebridge. Forecast for the day isn't to be great but we will turn up and see how it goes on the day.

We continued work on the stonewall canal bank during our last workday. Steady progress was made during the day.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 7th May 2016 (Cancelled due to rain)

A workday will be held this Saturday 7th May 2016 between 10:00 - 10:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*. Our work is due to continue on the our "Great Wall of China" - Boyneside!! We will be continuing to build up the stonewall canal bank, heading back up towards the the horsebridge. Forecast for the day isn't to be great but we will turn up and see how it goes on the day.

We continued work on the stonewall canal bank during our last workday. Steady progress was made during the day.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workparty 9th April 2016

A workday will be held this Saturday 9th April 2016 between 10:00 - 10:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

Masonary work will be the order of the day. We will be building the stone wall canal bank up to its full height and working back up to the horseshoe bridge. Forecast for the day isn't to be great but we will turn up and see how it goes on the day.

We last minute cancelled our workday as the weather turned it into a wash out, not a chance any work could be done.

The above notice has been written retrospective as we had an internal technical which prevented our workday notice been sent out. We are aware people check our website for the scandal of what we are planning to do :-)

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workparty 26th March 2016 (Cancelled due to wet weather)

Workparty 12th March 2016

A workday will be held this Saturday 12th March 2016 between 10:00 - 10:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

We will be resuming our masonary work there after our abrupt stop late last year when the irish "monsoon" rains started. There is only a small section of the canal stonewall bank to be repair and repointed. The forecast is susposed to be ideal for this work

We removed trees branches that have grown out into the Upper Oldbridge section of the Boyne Navigation. There is only a small bit more work to be done on this section but it will have to wait until next September at the earliest.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday 27th February 2016

A workday was held on Saturday 27th February 2016 between 10:00 - 10:30 at Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre).

We will be removing trees branches that have grown out into the Upper Oldbridge section of the Boyne Navigation. Maintenance of this sort is ongoing as nature and its parts doesn't give up so we will just keep it in check. The forecast is predicted to be dry but cold, so we'd hope the get loads of work done.

We had great success up at Athlumney during our last workday, a collection of fallen trees was removed below Athlumney Bridge by one of our teams. A second team cut back growth that had been impinging on the Boyne Navigation up by the council car park. A small but substancial section was cleared back. A full day was done here and we had some tired bodies afterwards.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday 13th February 2016

A workday will be held Saturday 13th February 2016 between 10:00 - 10:30 at Ramparts, Athlumney Bridge, Navan.

We will be removing trees that has fallen into the Navan section of the Boyne Navigation. We are aware that these have been down for awhile but due to our heavy work schedule down at the Lower Newgrange section it wasn't possible, we are only volunteers after all. and doing a general tidy up around the Stackallen Lock section of the Boyne Navigation (canal). The forecast is predicted to be dry so we'd hope the get loads of work done.

As per the plan the last day, cutting branches, scrubs and a general tidy up was done down at Stackallen Lock - Lock 16. Ivy that had grown along the lock chamber was removed. Cut stonework that had been covered by grass was also once again revealed. Wild grass growing the river side of the lock chamber was also cut back.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 30 January 2016

A workday will be held Saturday 30th January 2016 between 10:00 - 10:30 at Stackallen (Lock 16), Navan.

We will be cutting branches, scrubs and doing a general tidy up around the Stackallen Lock section of the Boyne Navigation (canal). The forecast is predicted to be dry so we'd hope the get loads of work done.

We were glad to put the nightware situation behind us, where we were prevented doing any work due to the hazardously high water levels. We cut any parts of trees which had either fallen or were dangerously leaning over the Oldbridge section of the Boyne Navigation.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 16th January 2016

A workday will be held this Saturday 16th January 2016 between 10:00 - 10:30 at at the Oldbridge Sealock - Lock 1*.

We will be cutting growth which has infringed on the Lower Oldbridge section of the Boyne Navigation (canal).

Due to the recently deludge of rain it had stopped us from holding any workdays since late October, which is hard to believe!! Some drastic photo of the floods that resulted and some of the damaged that occurred. Its looking like we will have a nippy day tomorrow so be prepared with you best Artic wear!!

The last work the last day involved a rubbish pick taking place on the Oldbridge section. A factory workers locker, car front wing and suspicious black sack of peat were recovered. We mixed up additional lime mortor for future stonework down at the Lower Newgrange section. We will hope that the canal hasn't gotten any generous donations over the break!!

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 14th November 2015

A workday will be held this Saturday 14th November 2015 between 10:00 - 10:30 at Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre).

We will be tidying up around the lock chambers of the Oldbridge Guardlock and Staleen, Donore, Co. Meath. Due to the poor weather and expected poor weather Saturday we won't be able to continue pointing and repairing the stone wall canal bank. The planned work maybe be subject to change, please express your interest to attend and we will keep an eye out on the day. If the plan changes we will also inform you of any such changes.

Our work the last day involved a rubbish pick taking place on the Oldbridge section. A factory workers locker, car front wing and suspecious black sack of peat. We mixed up additional lime mortor for future stonework.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 31st October 2015

A workday will be held this Saturday 31st October 2015 between 10:00 - 10:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

Work will continue with the pointing and repairing the stone wall canal bank. The planned work maybe be subject to change, please express your interest to attend and we will keep an eye out on the day. If the plan changes we will also inform you of any such changes.

We will be getting our tools together and material to carry out the work for the day thus the reason for the late start.

Our work the last day continued on the stone wall canal bank. Pointing was mostly carried out but one or two holes were also rebuilt and pointed.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 17th October 2015

A workday was held on the Saturday 17th October 2015 between 10:00 - 10:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

The plan is to continue pointing and repairing the stone wall canal bank.

We will be getting our tools together and little boat so we won't be down at the Oldbridge Sealock until between 10:00 - 10:30.

We concentrated our group into pulling out the dumped materials the last day, our haul on the day was, 1 washing machine, 1 gas cylinder heater, 1 engine part, 1 mini gas heater, 1 car tyre, 2 traffic cones, 1 single mattress, 1 bathroom sink, 1 bed end, 1 computer from 3 level IT and two black sacks of rubbish and one Meath Co. Co. "No Dumping" sign.

We are nearing the end of our group's entered into the Tesco - Community Fund in both Drogheda Tesco stores. If you already shop in either Tescos we would appreciate if you might consider donating some of those blue widgets that you might receive at the checkout.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 2nd October 2015

A workday will be held this Saturday 3rd October 2015 09:30 at the Oldbridge Sealock - Lock 1.

Due to success with retrieving dumped household appliances in certain section of the Oldbridge canal section, we are going to resume taking out more such rubbish. Water levels are extremely low (due to lack of rain) at this point so it would be a shame to not avail of this situation.

We will be getting our tools together and little boat so we won't be down at the Oldbridge Sealock until between 10:00 - 10:30.

We concentrated our group into pulling out the dumped materials the last day, our haul on the day was, 1 washing machine, 1 gas cylinder heater, 1 engine part, 1 mini gas heater, 1 car tyre, 2 traffic cones, 1 single mattress, 1 bathroom sink, 1 bed end, 1 computer from 3 level IT and two black sacks of rubbish and one Meath Co. Co. "No Dumping" sign.

We are nearing the end of our group's entered into the Tesco - Community Fund in both Drogheda Tesco stores. If you already shop in either Tescos we would appreciate if you might consider donating some of those blue widgets that you might receive at the checkout.

Hope to see you along on Saturday,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 19th September 2015

A workday will be held this Saturday 19th September 2015 09:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

We will be once again concentrating work on pointing and repairing the stonewall canal bank.

We didn't manage to resume this work last Saturday due to the rain which had fallen the night before that morning. We broke into two group, one tidied up our storage area and the other went removing stuff that had been throughen into the Oldbridge section of the canal. We managed to recover: 1 complete washing machine, 1 gas boiler, removed 2 trees which had fallen in the canal and a number of other smaller things

Our hardworking P.R.O. has managed to get our group entered into the Tesco - Community Fund in both Drogheda Tesco stores. If you already shop in either Tesco we would appreciate if you might consider donating some of those blue widgets that you might receive at the checkout.

Hope to see you along on Saturday or even better on Sunday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 12 September 2015

A workday will be held this Saturday 12th September 2015 09:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

We will be once again concentrating work on pointing and repairing the stonewall canal bank.

Our free boat trips afternoon was a great success in everyway expect that it rain over the course of the afternoon (like last year) but also into the evening. It is estimated that 50 people showed up on the day!! Going off the response we had to it on Facebook it looked like we could have drawn a big crowd, 84 expressions of interest!! A simple assumption that if 4 people were in each car that would have meant 100's of people would have shown up.

Our group along with Slane Canal Restoration have submitted an application to Fáilte Ireland, in relation to carrying out work on the Slane section of the Boyne Navigation. News of funding that was granted will be imminent.

Workday Notice 22th August 2015

A workday will be held this Saturday 22th August 2015 09:30 at the Oldbridge Sealock - Lock 1. We will be concentrating on the Oldbridge Sealock to ensure that it is looks it best. Our voluntary group will be running our biggest event of the year, free boat trips which will take place there on Sunday. Work to be done will include cutting the Locks private lawns, trimming back hedging that border the lock chamber and giving the place a general once over.

Hope to see you along on Saturday or even better on Sunday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 08 August 2015

A workday will be held this Saturday 8th August 2015 09:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section, weather dependent. We got a break in the weather during the last workday which allow for some stone work to be done. A part of the stone wall canal bank to be repointed. A horseshoe bridge which had experience vandalism of its stonework but our stonemeason made short work of this on the day. The bridge section is looking as good as every it once did.

Our big event of the year (Free boat trips - 23rd August) is fast approaching. Preparation has been taking place behind the scenes and these preparation will be ramping up in the lead up over the next 2 weeks. Be ready both Countys of Meath and Louth for our media blitz over the next short period!!

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workday Notice 25th July 2015

A workday will be held this Saturday 25th July 2015 09:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section, weather dependent. Due to the poor expected weather during our last two workdays this stonework had to be deferred.

These days weren't lost as we carried out a litter pick on the Oldbridge section of the Navigation. A total of 13 traffic cones, the shell of a washing machine, vacuum cleaner along with general rubbish was retrieved during these collections. The weather broke on both occasions and we had to abandoned our work, packed up our things and finished up our workday :-(

Workday Notice 11th July 2015

A workday will be held this Saturday 11th July 2015 09:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section, weather dependent. Due to the poor expected weather on the day and only a few volunteers who reported for duty, it was decided to carry out a litter pick on the Oldbridge section of the Navigation.

We started to collect litter on the water surface. Since water levels were so low and clear it allowed for the inspection along the bottom of a part of this section of the waterway. We found a collection of traffic cones which must have been dumped into along time ago. We managed to recover 12 of these cones. They were heavily limescaled and battered. We went back to reclaim more of these cones after lunch time but sadly the forecast rain started to come down. We abandoned our efforts, packed up our things and finished up our workday :-(

Workday Notice 27th June 2015

A workday will be held this Saturday 27th June 2015 09:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section. Solid progress made during our last workday, two big holes in the wall were rebuilt with stone.

Last weekend we had a very successful response from the public at The Irish Maritime Festival - Drogheda Port. We met some old faces, new and ones we hadn't met since last years festival. Our every en-genius P.R.O. came up with a great idea to aid raising some funds during the festival, that been to hold a raffle. He hasn't yet announced what amount of money was raised. We had a number of expressions of interest from people in volunteering and we glad to advise kayakers and other water users along with referring them onto people better in the know that us.

Workday Notice 13th June 2015

A workday will be held this Saturday 13th June 2015 09:30 at Lower Newgrange (Staleen, Donore, Co. Meath)*.

Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section. It was hoped to start back at this during our last 2 workdays but due to lack of hands and priority of cutting the canal walk verges at the back of Oldbridge House, that this took a back seat.

Work during our last workday consisted of reducing the height of vegetation along the section of the canal walkway out the back of Oldbridge House.

Workday Notice 23rd May 2015

A workday will be held this Saturday 23rd May 2015 09:30 at Staleen Lower* and Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre).

Our work will be concentrated in the Lower Newgrange section (Staleen, Donore, Co. Meath) and the Oldbridge Guardlock (back of Battle of the Boyne Centre) - Lock 2. Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section and possible removal of a dead tree stump down at the down at the Oldbridge Guardlock.

IrishTV visited our group, aired the piece and have it available on their website Episode 16. I have a copy available to view here. It was felt that all the stops were pulled out with this production by our group. The original programme can be viewed here The programme includes interviews with our Chairman and Project Manager.

Work planned this Saturday will be to concentrate of clearance of as much foliage as needed before the Habitat's directive comes into force, we won't have another workparty before enforced starts at the start of March. Depending on the number of volunteers that come along additional work maybe carried our on planned steps area.

Workday Notice 16th May 2015

A workday will be held this Saturday 16th May 2015 09:30 at Staleen Lower* and Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre).

Our work will be concentrated in the Lower Newgrange section (Staleen, Donore, Co. Meath) and the Oldbridge Guardlock (back of Battle of the Boyne Centre) - Lock 2. Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section and possible removal of a dead tree stump down at the down at the Oldbridge Guardlock.

We will have a team of volunteer taking part in the Louth Volunteer - Open Day on West Street in Drogheda also. We will have a stand where we will be giving out our groups leaflets and are ready to talk to people about the work we are carry out on the Boyne Navigation/ canal.

IrishTV visited our group, aired the piece and have it available on their website Episode 16. I have a copy available to view here. It was felt that all the stops were pulled out with this production by our group. The original programme can be viewed here The programme includes interviews with our Chairman and Project Manager.

Work planned this Saturday will be to concentrate of clearance of as much foliage as needed before the Habitat's directive comes into force, we won't have another workparty before enforced starts at the start of March. Depending on the number of volunteers that come along additional work maybe carried our on planned steps area.

Workday Notice 2nd May 2015 (Workday was cancelled due to extreme rain)

A workday will be held this Saturday 16th May 2015 09:30 at Staleen Lower* and Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre).

Our work will be concentrated in the Lower Newgrange section (Staleen, Donore, Co. Meath) and the Oldbridge Guardlock (back of Battle of the Boyne Centre) - Lock 2. Worked planned for the day will be continuation of pointing of the stone wall bank on the Lower Newgrange section and possible removal of a dead tree stump down at the down at the Oldbridge Guardlock.

IrishTV visited our group, aired the piece and have it available on their website Episode 16. I have a copy available to view here. It was felt that all the stops were pulled out with this production by our group. The original programme can be viewed here The programme includes interviews with our Chairman and Project Manager.

Work planned this Saturday will be to concentrate of clearance of as much foliage as needed before the Habitat's directive comes into force, we won't have another workparty before enforced starts at the start of March. Depending on the number of volunteers that come along additional work maybe carried our on planned steps area.

Workparty Notice 18th April 2015

A workday will be held this Saturday 18st April 2015 at 09:30. at the Oldbridge Guardlock (back of Battle of the Boyne centre)

We will meet up down at the Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre) and volunteers will be issued work. There isn't any parking at the area but people might be able to park in the Battle of the Boyne Centre/ Oldbridge House car park. The plan for Saturday is to add additional gravel to the towpath (walkway next to the canal) to fix potholes along with drainage problems on it. There is also a tree stump in the humpback bridge just above where we are working and it is hoped that it can also be removed. There was three bags of litter thrown in midway in the section we are working, with great effort and alot of hassle we managed to remove one of these, it is hoped that we can remove the remaining two this Saturday.

As per my message the last time about IrishTV visiting our group they aired the piece and their website two Thursday back and I have a copy available to view here. It was felt that all the stops were pulled out with this production by our group. The original programme can be viewed here The programme includes interviews with our Chairman and Project Manager.

Work planned this Saturday will be to concentrate of clearance of as much foliage as needed before the Habitat's directive comes into force, we won't have another workparty before enforced starts at the start of March. Depending on the number of volunteers that come along additional work maybe carried our on planned steps area.

Workday Notice 21 March 2015

A workday will be held this Saturday 21st March 2014 at 09:30. at the Oldbridge Guardlock (back of Battle of the Boyne centre)

We will meet up down at the Oldbridge Guard Lock - Lock 2 (back of Battle of the Boyne Centre) and volunteers will be issued work. there isn't any parking at the area but people might be able to park in the Battle of the Boyne Centre/ Oldbridge House car park. The plan for Saturday is to continue flattening the mounts of spoil resulting from scrapping and regravelling the towpath (canal walkway), additional work on our corridor from the humpback bridge down to the Oldbridge house side of the lock chamber of Lock for work to continuation of build the flight of steps and additional preparatory work for when the lockgates will be installed at the Guardlock.`We will be carrying out a litterpick and also plan to remove fallen branches along the entire canal section (Oldbridge)

As per my message the last time about IrishTV visiting our group they aired the piece and their website two Thursday back and I have a copy available to view here. It was felt that all the stops were pulled out with this production by our group. The original programme can be viewed here The programme includes interviews with our Chairman and Project Manager.

Work planned this Saturday will be to concentrate of clearance of as much foliage as needed before the Habitat's directive comes into force, we won't have another workparty before enforced starts at the start of March. Depending on the number of volunteers that come along additional work maybe carried our on planned steps area.

Workday Notice 07 March 2015

A workday will be held this Saturday 07th March 2014 at 09:30. at the Oldbridge Guardlock (back of Battle of the Boyne centre)

We will meet up down at the Oldbridge Guard Lock (back of Battle of the Boyne Centre) and volunteers will be issued work. there isn't any parking at the area but people might be able to park in the Battle of the Boyne Centre/ Oldbridge House car park. The plan for Saturday is for work to continuation of build the flight of steps and additional preparatory work for when the lockgates will be installed at the Guardlock.

The 1st 5 steps were put in place the last day which will lead people from the humpback bridge just above Lock 2. These steps will eventually lead down to the lock chambers on this side of the canal. Our "big cut" started out well and we were making good headway until the weather turned for the worst. A new tool in our armour for cutting problematic tree was given a trail run/ cut, tree better watch out as its an animal for cutting!! Additional clearance of ivy on the humpback bridge also took place.

As per my message the last time about IrishTV visiting our group they aired the piece and their website two Thursday back and I have a copy available to view here. It was felt that all the stops were pulled out with this production by our group. The original programme can be viewed here The programme includes interviews with our Chairman and Project Manager.

Work planned this Saturday will be to concentrate of clearance of as much foliage as needed before the Habitat's directive comes into force, we won't have another workparty before enforced starts at the start of March. Depending on the number of volunteers that come along additional work maybe carried our on planned steps area.

Our Facebook page has reached a milestone of 500 "Like"s and is getting closer everyday to the 600 mark, we would appreciate if people could spread the word about our group, the work we are carrying out and if the recipients could spare the time to give our above mentioned page a "Like", all the better!! We would like to thank one and all for their support in helping us reach this mark after it only been in existence since April 2014, roll on 1000 ;-). Photos of our workparties can be viewed there along with news and additional information that takes place along the Boyne canal/ navigation section.

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure of a hump back bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall. About 1/2 of the stone wall has been repointed and repaired at this stage but due to the change in weather we may not be able to do any further such work until the Spring.

Workday Notice 21 February 2015

A workparty will be held this Saturday 21th February 2014 at 09:30. at the Oldbridge Guardlock (back of Battle of the Boyne centre)

We will meet up down at the Oldbridge Guard Lock (Green tick mark) and volunteers will be issued work. there isn't any parking at the area but people might be able to park in the Battle of the Boyne Centre/ Oldbridge House car park. We had some unusual but very welcome visitors at our last workparty that been Irish TV - Louth Edition. They interviewed our Chairman and Project Manager. They filmed some of our volunteers carrying out work on the day. When they had finished with our group they moved up to fishmen fishing the canal section just above where we are working, the footage from this can be viewed on the current programme been broadcast. We haven't been told when our segment will be broadcast but because do check back or visit our Facebook page for further updates.

Additional preparatory work carried out on the steps area on Oldbridge House side of the canal, clearance of more ivy, a litter pick was also done with our groups dinghy (small boat) and a trail of items we retrieved (two dead animal thrown into the canal), a wardrobe mirror on wardrobe door, loads of bottles (both plastic and glass), tree branches.

Work planned this Saturday will be to concentrate of clearance of as much foliage as needed before the Habitat's directive comes into force, we won't have another workparty before enforced starts at the start of March. Depending on the number of volunteers that come along additional work maybe carried our on planned steps area.

Our Facebook page has reached a milestone of 500 "Like"s and is getting closer everyday to the 600 mark, we would appreciate if people could spread the word about our group, the work we are carrying out and if the recipients could spare the time to give our above mentioned page a "Like", all the better!! We would like to thank one and all for their support in helping us reach this mark after it only been in existence since April 2014, roll on 1000 ;-). Photos of our workparties can be viewed there along with news and additional information that takes place along the Boyne canal/ navigation section.

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure of a hump back bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall. About 1/2 of the stone wall has been repointed and repaired at this stage but due to the change in weather we may not be able to do any further such work until the Spring.

Workparty Notice - 25 January 2015

A new year means a new years schedule of workparties been held by our group. A workparty will be held this Saturday 24th January 2014 at 09:30. at the Oldbridge Guardlock (back of Battle of the Boyne centre)

We will meet up at "Our compound" (near the Lower Newgrange section.) and volunteers will be issued work. We have over a month break at this stage and over the holiday I am sure an excess of good cheer was had so it is now time to start burning that off. Work planned will be the "cutting and clearing" growth that has occurred over the last year in this areas. Work undertake at our last work party was the restoration/ putting in place of step above the Oldbridge Sealock and preparation work was carried out on the Lower Newgrange section (Staleen, Donore). Photos of steps can be seen on our Facebook page.

Our Facebook page has reached a milestone of 500 "Like"s, we would like to thank one and all for their support in helping us reach this mark after it only been in existence in April 2014, roll 1000 ;-). I put up photo of how the mass of rain effect various stretch of the Boyne Navigation/ canal and I have kept a couple as it would be hard to get perspective on the area when against them not been flooded, I will put these photos up early next week!!

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure of a hump back bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall. About 1/2 of the stone wall has been repointed and repaired at this stage but due to the change in weather we may not be able to do any further such work until the Spring.

Workparty Notice - 10 January 2015

A new year means a new years schedule of workparties been held by our group. A workparty will be held this Saturday 10th January 2014 at 09:30. at the Oldbridge Guardlock (back of Battle of the Boyne centre)

We will meet up at "Our compound" (near the Lower Newgrange section.) and volunteers will be issued work. We have over a month break at this stage and over the holiday I am sure an excess of good cheer was had so it is now time to start burning that off. Work planned will be the "cutting and clearing" growth that has occurred over the last year in this areas. Work undertake at our last work party was the restoration/ putting in place of step above the Oldbridge Sealock and preparation work was carried out on the Lower Newgrange section (Staleen, Donore). Photos of steps can be seen on our Facebook page.

Our Facebook page has reached a milestone of 500 "Like"s, we would like to thank one and all for their support in helping us reach this mark after it only been in existence in April 2014, roll 1000 ;-). I put up photo of how the mass of rain effect various stretch of the Boyne Navigation/ canal and I have kept a couple as it would be hard to get perspective on the area when against them not been flooded, I will put these photos up early next week!!

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Workparty Notice - 6th December 2014

A workparty will be held this Saturday 6th December 2014 at 09:30.

Due to the recent mixed wet spell it hasn't been decided what work will be carried out tomorrow. We will meet up at "Our compound" (near the Lower Newgrange section.) and volunteers will be issued work. Steady work continued on the pointing and rebuilding of the bits of stonewall which borders the Lower Newgrange section during the last workparty.

Our Facebook page has reached a milestone of 500 "Like"s, we would like to thank one and all for their support in helping us reach this mark after it only been in existence in April 2014, roll 1000 ;-). I put up photo of how the mass of rain effect various stretch of the Boyne Navigation/ canal and I have kept a couple as it would be hard to get perspective on the area when against them not been flooded, I will put these photos up early next week!!

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure of a hump back bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall. About 1/2 of the stone wall has been repointed and repaired at this stage but due to the change in weather we may not be able to do any further such work until the Spring.

Workparty Notice - 22nd November 2014

A workparty will be held this Saturday 22th November 2014 at 09:30.

Due to the recent mixed wet spell it hasn't been decided what work will be carried out tomorrow. We will meet up at "Our compound" (near the Lower Newgrange section.) and volunteers will be issued work. Steady work continued on the pointing and rebuilding of the bits of stonewall which borders the Lower Newgrange section during the last workparty.

Our Facebook page has reached a milestone of 500 "Like"s, we would like to thank one and all for their support in helping us reach this mark after it only been in existence in April 2014, roll 1000 ;-). I put up photo of how the mass of rain effect various stretch of the Boyne Navigation/ canal and I have kept a couple as it would be hard to get perspective on the area when against them not been flooded, I will put these photos up early next week!!

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure of a hump back bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall. About 1/2 of the stone wall has been repointed and repaired at this stage but due to the change in weather we may not be able to do any further such work until the Spring.

Workparty Notice - 25th October 2014

A workparty will be held this Saturday 25th October 2014 at 09:30, Lower Newgrange section*.

Our work will be concentrated in the Lower Newgrange section (Staleen, Donore, Co. Meath).

The plan for work to be done on Saturday will be to continue restoration work (pointing and rebuilding) of the stonework on the stonewall bank which boarders the canal/ Navigation in this section. We have been working up here for the last two workparties and have completed over half this work. It is expected that it will take another two workparties before will have this particular job finished.

A new recruit (Fergal) we have gained through our Facebook page dedicated some of his Wednesday morning attempting to find barges which are located in the River Boyne, StackallenHe was blindly trying to find the boats but sadly he didn't have any success!!

Workparty Notice - 11th October 2014

A workparty will be held this Saturday 11th October 2014 at 09:30, Staleen Lower*.

Our work will be concentrated in the Lower Staleen area.

We have nearly had a mths break since a paint brush has been raised, shovel has dug, stone has been lifted, mortor has been moved, our voluntaries must have experience great boardem over the last so get ready for some hard labour this Saturday ;-)

We had great success of the last while at our various publicity event we attended. We received great interest from the public and generous donation. We also held our Open day at the Oldbridge Sealock for the first time in about 4 years. It was estimated that 100 people availed of the opportunity to have a spin on the Boyne Navigation - Oldbridge section. Photos from these various events can be found on our Facebook page.

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure that been a horse bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall.

* Parking isn't available at the worksite so please contact us on either our Facebook page or using the above link

Current Workparty Notice

A workparty will be held this Saturday 27th September 2014 at 09:30, Staleen Lower*.

Our work will be concentrated in the Lower Staleen area.

We have nearly had a mths break since a paint brush has been raised, shovel has dug, stone has been lifted, mortor has been moved, our voluntaries must have experience great boardem over the last so get ready for some hard labour this Saturday ;-)

We had great success of the last while at our various publicity event we attended. We received great interest from the public and generous donation. We also held our Open day at the Oldbridge Sealock for the first time in about 4 years. It was estimated that 100 people availed of the opportunity to have a spin on the Boyne Navigation - Oldbridge section. Photos from these various events can be found on our Facebook page.

If anyone who we meet at either the Irish Maritime Festival or SonŠirte, Duleek, Slane, from our Open day or anyone else is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure that been a horse bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall.

* Parking isn't available at the worksite so please contact us on either our Facebook page or using the above link

Workparty 16th August 2014

A workparty will be held this Saturday 16th August 2014 at 09:30, Staleen Lower*.

Our work will be concentrated in the Lower Staleen area.

Our workparty was cancelled on the 2nd August so our voluntaries must be chomping at the bit for some hard labour ;-)

Our awareness campaign took a break from the River Shannon but will be re-established once again as of today so Shannon boaters be warned as a Boyne leaflet and a friendly chat maybe coming your way. We have noticed an noticeable increase in enquires or a number of additional "Like"s to our Facebook page. She will be given the same wage on offer to workparty regulars that been a free lunch (sandwiches, tea/ coffee and cake). An optional extra will also be extended to her of an morning and afternoons workparty.

If anyone who we meet at either the Irish Maritime Festival or SonŠirte is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: This shows the wall which forms the bank of the early Staleen section just above Staleen Lock (Lock 3) on the canal. A lovely protected structure that been a horse bridge can be seen in the distance. As you can see from the picture a stone has fallen out of the wall and sadly this is repeated in a number of section of the wall.

* Parking isn't available at the worksite so please contact us on either our Facebook page or using the above link

Workparty 2nd August 2014

A workparty will be held this Saturday 2nd August 2014 at 09:30, Staleen Lower*.

Our work will be concentrated in the Lower Staleen area.

Our awareness campaign has moved to the River Shannon a mother of one of our has kindly taken up the cause of raising awareness of our restoration efforts of the Boyne Navigation. We have noticed an noticeable increase in enquires or a number of additional "Like"s to our Facebook page. She will be given the same wage on offer to workparty regulars that been a free lunch (sandwiches, tea/ coffee and cake). An optional extra will also be extended to her of an morning and afternoons workparty.

If anyone who we meet at either the Irish Maritime Festival or SonŠirte is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

Hope to see you along on Saturday!!,
Eugene Carbery, Project Manager,
Boyne Navigation Branch.

Photo: The finished steps and rebuilt wall looks as so at the Oldbridge Sealock.

* Parking isn't available at the worksite so please contact us on either our Facebook page or using the above link

Workparty 19th July 2014

The Boyne Navigation Branch will be holding a workparty this Saturday 19th July 2014 at 09:30, at the Oldbridge Sealock

Work plan for the day:

  • 1. Painting of the Sealock gates.
  • 2. Erection of the sign at the Oldbridge Sealock.
  • 3. Additional work to be decided on the day and weather dependent.

    A further steady increase in "Likes" has been experienced by our Facebook page. Articles added to it since the last workparty, Fallen tree at Athlumney, video of boat trip from Mary Mc Aleese bridge to Oldbridge Sealock and Photos of work done at the last workparty.

    If anyone who we meet at either the Irish Maritime Festival or SonŠirte is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

    The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Workparty 5th July 2014

    A workparty is going to be held Saturday 5th July 2014 at 09:30, at the Oldbridge Sealock and Staleen Lower*.

    Work scheduled for on the day:

  • 1. Continue work at the stone canal wall at Staleen Lower.
  • 2. Erection of the sign at the Oldbridge Sealock.
  • 3. Possibly painting of the lockgates at the Oldbridge Sealock.

    If anyone who we meet at either the Irish Maritime Festival or SonŠirte is interested in coming along on Saturday you are more than welcome. A free lunch is available to all volunteers (and its said such doesn't exist :-)

    Our Facebook page has increased in people viewing articles at a steady pace. Photos of note are, work we carried out at our last workparty, previous workparties and our presence at the Irish Maritime Festival. Popular articles so far have been about the proposed Marina/ mooring at Drogheda, Bovinda - The Newgrange Currach and our stand at the Irish Maritime Festival.

    The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Photo: The finished steps and rebuilt wall looks as so at the Oldbridge Sealock.

    * Parking isn't available at the worksite so please contact us on either our Facebook page or using the above link

    Workparty 28th June 2014

    The Boyne Navigation branch will be holding a workparty this Saturday 28th June 2014 at 09:30, at the Staleen Lower* (location change).

    Our branch has been involved five public awareness events since our last workparty, three days at the Irish Maritime Festival, 1 day at SonŠirte and late evening at the Navan Course Angling Clubs Athlumney event. We gained a very positive response from the public at one and all. New leaflets were published in advance of these events. We received generous donations and made interesting contacts. We will look forward to meeting any of the people who we interacted with and would be interested in coming along to a workparty day.

    Photos of our presences at the Irish Maritime Festival can be found on our branch Facebook page.

    The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Photo: The finished steps and rebuilt wall looks as so at the Oldbridge Sealock.

    * Parking isn't available at the worksite so please contact us on either our Facebook page or using the above link

    Workparty 5th June 2014

    Workparty to be held Saturday 7th June 2014 at 09:30, at the Oldbridge Sealock. Our work will be focused on both the Oldbridge Sealock (Lock 1) and Staleen (Lock 3). It is planned to once again erect the sign which was formerly at the Oldbridge Sealock. We havenít done any work up at Staleen Lock and environs in over 18 months so some of us will be going up there to see what work needs to be done.

    As planned the last day topsoil was laid and grass seeds was spread over the Estuary wall section of the Oldbridge Sealock. The railings on the Estuary wall steps around that section of the wall was installed.

    Photo of the installed railings at the Estuary steps and wall can be found on our branch Facebook page, Facebook page.

    The Greenway was officially opened back in the middle of April with cyclists, runners, walkers and all others making great use of it.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Photo: The finished steps and rebuilt wall looks as so at the Oldbridge Sealock.

    Workparty 24th May 2014

    The Boyne branch are holding a workparty Saturday 24th May 2014 at 09:30, location: Oldbridge Sealock. The Sealock is pretty much finished, work planned to take place on the day: spreading of topsoil on the last section, spreading grass there then, installation of railings on the Estuary wall steps around that section of the wall. Other work maybe done depending on the number of people that show up.

    Some of our members took place in a Volunteer Ireland open day in Drogheda last Saturday. The great work which has taken place at the Sealock in the recent past can be found on our Facebook page.

    The Greenway was officially opened 2 Wednesdays back and going off the traffic I need before it was in place it going to be one busy passage way with cyclists, runners, walkers and all others that may use it.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Workparty 10th May 2014

    Workparty is due to take place Saturday 10th May 2014 at 09:30, location: Oldbridge Sealock. The schedule on Saturday is to continue working on the Estuary end of the Sealock to finish off paving and continue to build up the Estuary wall.

    After a false start with our Facebook page our new page after 2 weeks has gotten 149 "like"s. Our most popular entry so far are the photos from our last workparty thanks to our mechanical man.

    The boardwalk is now open for cyclists, walkers and all others to use. It isn't officially open yet but that is imminent I am sure.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Photo: Six additional steps were added at the last workparty, this is a photograph taken at an earlier part of the day, landing jetty can been seen in this photo. Note the cleaner stone was added on the day verus darker stone indicating stone built up at the previous workparty.

    Workparty 26th April 2014

    Boyne branch are planning to hold a workparty this coming Saturday, 26th April, 2014 commencing 9:30 a.m. at the Sealock, Oldbridge.

    Work planned to take place this Saturday continuation of building up the wall at the estuary end of the Sealock. Topsoil is also expected to be spread at the area above the estuary wall which is been built. A call once again for all available volunteers and members to come along.

    Our branch branch Facebook page has already gained 120 friends not bad going considering it is less than 2 weeks old.

    An extra three steps were added to the stairway of the estuary wall at the mouth of the Sealock, Oldbridge. The correct step level has now been reached. The level of the walkway leading to the steps was been built up also the last day. The soil areas between the canal end of the lock and area next to the Sealock chamber have now been cleared of rubble and topsoil was spread on both. Grass seed was then spread on these areas.

    The boardwalk is now open for cyclists, walkers and all others to use. It isn't officially open yet but that is imminent I am sure.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Photo: Six additional steps were added at the last workparty, this is a photograph taken at an earlier part of the day, landing jetty can been seen in this photo. Note the cleaner stone was added on the day verus darker stone indicating stone built up at the previous workparty.

    Workparty 19th April 2014

    Work Party will take place Saturday, 19th April, 2014 commencing 9.30 a.m. at the Sealock, Oldbridge.

    The focus this Saturday will be to finish preparing the kerbed area between the Greenway cycle track and the Sealock paving. We have topsoil on site but its just a matter of clearing the area of rubble and spreading out the topsoil. If we have more than enough volunteers I am sure they could be set to painting the lockgates.

    Our branch decided at our last committee meeting to adopt a Facebook page, this has since been implemented and has grown to one hundred friends already, not bad considering it has only been setup since last Friday!!!

    Six extra steps were added to the stairway of the estuary wall at the mouth of the Sealock, Oldbridge. The Sealock is shaping up nicely for an imminent opening.

    Additional boardwalk was completed at the Greenway section in the area between the end of the sheephouse rd and Rathmullen road. None of the boardwalk including this section is open to traffic due to the ongoing work but its opening will be imminent.

    Hope to see you along on Saturday!!,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Photo: Six additional steps were added at the last workparty, this is a photograph taken at an earlier part of the day, landing jetty can been seen in this photo. Note the cleaner stone was added on the day verus darker stone indicating stone built up at the previous workparty.

    Workparty 29th March 2014

    Work Party will take place this coming Saturday, 29th March, 2014, commencing at 9.30 a.m. at the Sealock, Oldbridge.

    Possible planned work will consist of finishing the paving, stonework on the steps, estuary entrance wall and painting if the weather permits.

    A great start was made on the estuary wall the last day, as can be noted from the photo. The paving on the canal end is pretty much complete with the slabs needing to be laid. Measurements were been taken up at the Guardlock.

    The Greenway now is bordered with railings between the Ramparts and the estuary end of the Sealock. The contractors were even working on Saturday during our last workparty thus showing how dedicated they are to the project. The boardwalk wasn't open as parts of the surface were lifted and barriers placed across it at stages.

    Hope to see you along on Saturday!!,
    Seamus Costello, Secretary,
    Boyne Navigation Branch.

    Photo: is of Fiachra in thinking mode!!! A suggested comment for the photo already has been "This is what's known as a Hard Hat lads. Very useful when you're working with lots of big, heavy rocks." :) I won't repeat what the other suggested comment was but it involved a telling off from "the boss" and been hung off the nearest tree.

    Workparty 25th Febuary 2014

    A Work Party will take place Saturday, 22nd February, 2014 at the Ramparts, Athlumney, Navan commencing at 9.30 a.m. This will be our last workparty to be held before the habitat's directive comes into place so it will mean "all hands on deck", to borrow a maritime phrase.

    People can park their car's next to the canal at the bottom of the lane.

    Alot of heavy work was done last week consisting of cutting trees or branches which were either impinging on the canal navigation or had simply fallen into the canal itself, these were then removed, cut up and removed. The section is looking alot better after the work and a number of walkers complemented the work. Work will be similar to last Saturday and it is hoped to get it finished and the towpath cleaned up.

    Tea, coffee, soup and sandwiches will be provided as usual.

    Apologies in advance for the non-attendance of myself and Fiachra who will be sweating it out in the Park Hotel, Mullingar, on the branch's behalf !!!

    Our branch welcomed along a number of new workers, one of them been the infamous "RampartsBoyneRiver" (Adrian, I think), he has been documenting changes that have been taking place along the Navan section of the canal over the last while. It was great to have him along and he sounded enthusiast to join in on the work we are doing down the other end of the navigation at the Sealock, Oldbridge. He has some really nice photos of the Boyne canal and River.

    Hope the guys are as successful this Saturday!!,
    Seamus Costello, Secretary,
    Boyne Navigation Branch.

    Photo: The above photo shows the "carnage" and "treasure" we reeked and found respectively during our two stints up at Athlumney last year. More pictures during those workparties can be found here, including one of our cake monster ;-)

    Workparty 15th Febuary 2014

    Workparty to be held on Saturday, 15th Febuary starting at 09:30. Sadily this has been only our second workparty this year due to the heavy rain over the last number of weeks. We will be based up in Athlumney, Navan. Lots of work is planned for the day so we hope as many volunteers that are available will give a helping hand. To quote the former boss "the Boyne canal rats are back at work".

    The proposed work will comprise:
    1. The cutting of over growth: trees, foliage that overhangs the canal.
    2. The clearance of fallen trees and other such dead growth in the canal.
    3. Once this is brought onto the bank, it will be loaded onto transport and removed from site.

    People can park their car's next to the canal at the bottom of the lane.

    See ye on Saturday,
    Eugene Carbery, Project Manager,
    Boyne Navigation Branch.

    Photo: The above photo shows the "carnage" and "treasure" we reeked and found respectively during our two stints up at Athlumney last year. More pictures during those workparties can be found here, including one of our cake monster ;-)